PHOTO GALLERY

Welding on the next joint of pipe. With smaller rigs pipe lengths must be 10’ which makes the job take longer.

Test well looking for large production for fire protection for King’s Chapel Wasilla

Drilling in Rampart.

Drilling in Rampart.

Drilling residential wells in Village of Rampart for ANTHC ( Alaska Native Tribal Health Consortium)

Dutch Harbor

Developing a Test well for Anchorage Water and Wastewater Utility. Ground became unstable and had to move drill rig off of well and finish with lighter weight equipment.

Drilling residential wells in Village of Rampart for ANTHC ( Alaska Native Tribal Health Consortium)

Drilling in Rampart.

Well rehabilitation using chemical treatment and air lift for the City of King Cove.

Large track rig drilling on air strip. Wasilla.

Dutch Harbor

Remote rig on skiis drilling.

Drilling in Rampart.

Well rehabilitation using chemical treatment and air lift for the City of King Cove.

Drilling in Rampart.

Residential site Matsu Valley

Drilling in Rampart.

Dutch Harbor

Drilling in Rampart.

Drilling in Rampart.

Flying air compressor off remote sight

Dutch Harbor